Comprehensive Transformer Testing System

Send Inquiry
Comprehensive Transformer Testing System
Details
MOEORW-WT408 is All-in-one comprehensive transformer testing system integrating multiple test functions, reducing wiring times for substation acceptance, overhaul and routine preventive tests.
Category
Transformer Test Set
Share to
Description

Product Introduction

 

    The integrated comprehensive transformer testing system combines mainstream transformer electrical test items in one unit. It simplifies complex on-site wiring, shortens overall test cycle, and meets full-item detection requirements for power transformers in industrial and power grid projects.

 

Product Parameter (specification)

 

1. DC resistance

Three-phase test

Three levels: 10A, 5A, and 1A

Test range

10A: 500.0μΩ~2Ω

5A: 10mΩ~4Ω

1A: 1 Ω ~ 20 Ω

Phase separation test

Four gears: 20A, 10A, 5A, and 1A.

Test range

20A: 100.0 μΩ ~ 1 Ω

10A: 500.0μΩ~2Ω

5A: 10mΩ~4Ω

1A: 1Ω~20Ω

resolution

0.1μΩ

Measurement accuracy

Level 0.2

 

2. Short - circuit impedance

Voltage measurement range: 5-400V

Measurement accuracy: 0.2 class

Current measurement range: 0.1-10A;

Measurement accuracy: 0.2 class

 

3. On - load switch

Output current

1A, 0.5A

Resistance resolution

0.01Ω

Transition resistance range

0.2Ω~20Ω 1Ω~50Ω

Transition time range

0~240ms

Measurement accuracy

Transition resistance ± (5% + 0.2Ω)

same period of time

0.1ms

 

4. Demagnetization and verification of demagnetization

Output DC current

1A - 10A

Output DC voltage

20V, 30V, 40V, 50V

 

5. Transformer turns ratio​

Transformer range

1-5000

Accuracy

0.1% (0.8-1000)

0.2% (1000-2000)

0.5% (2000-5000)

Measurement Group

YY0, YY6, YD1, YD5, YD7, YD11, DD0, DD2, DD4, DD6, DD8, DD10, DY1, DY5, DY7, DY11

Test voltage

10V/160V

Operating temperature

-10℃ to 40℃

 

Product features and applications

 

  1. All-in-one integrated design, integrates multiple transformer test functions.
  2. One-time wiring design, effectively reducing repeated connection errors.
  3. Industrial anti-interference circuit, stable operation in complex substation environments.
  4. Automatic data calculation, report one-click generation and export.

 

Prodection details

 

   Specially used for substation handover acceptance, power equipment overhaul, high-voltage transformer routine preventive test, meeting full-item detection needs of power grid and large industrial enterprises.

 

Company Qualifications

 

 

FAQ

 

Q: Are you a factory or a trading company?

A: We are a professional manufacturer of testing equipment.

Q: How is the after-sales service?

A: The warranty period is 12 months. After the warranty period, we also provide lifetime service paidrepair or service.

Q: What about transportation?

A: It depends on your requirements. We can ship to your airport by air, to your seaport by sea, or to your office by courier.
We also accept cooperation with your shipping agent.

Q: Are your keyboard, interface, software, and manuals in English?

A: Yes, if you are using the English version of the keyboard, interface, software, and manual and require other languages, please contact us for confirmation.

 

Hot Tags: comprehensive transformer testing system, China comprehensive transformer testing system manufacturers, factory

Send Inquiry