Product Introduction
MOEORW-W361 insulating operating rod test stand is developed in accordance with the requirements of Preventive Test Regulations for Electric Safety Tools (Trial) (Guo Dian Fa [2002] No.777) issued by the State Power Corporation of China, and all performance indicators comply with national standards. It is professional equipment for conducting insulation withstand voltage tests on insulating operating rods, supporting batch inspection of power safety tools, and suitable for all power industry scenarios. It can be matched with an optional boost transformer to form a complete high-voltage withstand test system.
Product Parameter (specification)
Environmental Conditions
|
Operating Temperature |
-10℃ ~ 40℃ |
|
Humidity |
≤90%RH, no condensation |
|
Continuous Operation |
Long-time continuous operation supported |
Two Model Specifications
|
Item |
Model 1 |
Model 2 |
|
Overall Dimension |
700mm(L)×1000mm(W)×950mm(H) |
900mm(L)×1000mm(W)×1300mm(H) |
|
Max Test Quantity |
10 pcs at one time |
10 pcs at one time |
|
Max Withstand Voltage |
50KV |
150KV |
|
Matching Set Configuration |
2 sets |
3 sets |
|
Electrode Material |
Conductive sponge |
Conductive sponge |
|
Net Weight |
20kg |
25kg |
Wiring Requirement
Connect the high-voltage terminal of boost transformer to one end of the test stand (keep high-voltage wire suspended); the other end of the stand shall be reliably grounded.
Product feature
1.Batch testing design: Double-group electrode & two-section pressure-resistant structure, capable of testing 10 insulating rods simultaneously to greatly improve detection efficiency.
2.Wrap-around conductive sponge electrodes: Fully fit the surface of insulating rods for stable and uniform contact, ensuring accurate test data.
3.Self-locking opening & closing structure: Easy to load and unload test samples, saving preparation time for daily repetitive testing.
4.Stainless steel upper frame + insulating yellow support columns: High mechanical strength, good insulation performance, anti-rust and durable.
5.Universal moving casters at the bottom: Flexible movement, convenient for laboratory and on-site power test work.
6.Two voltage grades (50KV / 150KV) optional, meet different voltage-level insulating rod test demands.
Product Application
- Power supply bureaus, power transmission & transformation maintenance teams
- Power construction engineering companies
- Safety tool testing laboratories
- Electrical equipment manufacturing factories
- New energy power station operation & maintenance departments
- All enterprises requiring regular preventive tests for electric safety insulation tools
Standard Random Modules
1.Complete MOEORW-W361 test stand main body
2.Conductive sponge electrode strips (full set)
3.Installation fixing bolts & accessories
4.Original English & Chinese operation manual
5.Grounding wire for high-voltage test
Optional Matching Modules
1.High-voltage boost transformer (50KV / 150KV corresponding models)
2.Digital high-voltage withstand voltage test console
3.Extended positioning limit fixture for ultra-long insulating rods
FAQ (Trust-Building Universal Questions for Buyers)
Q1: Does this test stand comply with national power industry test standards?
A1: Yes. This product is developed strictly following Preventive Test Regulations for Electric Safety Tools (Trial) (Guo Dian Fa [2002] No.777), all technical parameters meet national standard requirements, and test reports from the equipment can be recognized by power supervision departments.
Q2: Can it test different types of insulating operating rods?
A2: Yes. The wrap-around conductive sponge electrodes can adapt to round, flat and other common shapes of insulating rods, compatible with all conventional electric insulating operating rods used in power industry.
Q3: How many rods can be tested at once, is the test efficiency high?
A3: The stand supports testing 10 insulating rods in one batch, with self-locking quick loading structure. Compared with single-piece test racks, it can save over 70% of sample loading time, ideal for mass daily inspection work.
Q4: What's the difference between the 50KV and 150KV versions, how to choose?
A4: The 50KV model is for low & medium voltage insulating rods (10kV/35kV power tools); the 150KV model fits high-voltage insulating rods for 110kV/220kV power systems. You can select according to the maximum voltage level of your test samples. We provide professional selection consultation free of charge.
Q5: Is the equipment safe during high-voltage withstand test?
A5: The support columns adopt high-insulation yellow epoxy tubes, the metal frame is equipped with reliable grounding terminals, and the high-voltage wiring specification is clearly marked in the manual. As long as operating steps are followed, no electric leakage risk occurs during testing. All key components pass factory high-voltage safety inspection before delivery.
Q6: What's the warranty policy?
A6: We provide 1-year full warranty for the whole machine. Damage caused by quality problems of original parts within the warranty period can enjoy free replacement and maintenance. Damage from improper operation, soaking, falling or unauthorized circuit modification is excluded from warranty, and we still offer low-cost after-sales repair service.
Q7: Can you provide technical support after purchase?
A7: Yes. We supply lifelong technical support. Our professional electrical engineers can provide remote guidance for equipment installation, wiring and operation; if on-site training is needed, we can arrange technicians according to your project demand.
Q8: Is the equipment easy to move and store?
A8: The base is equipped with silent universal casters, allowing free movement in laboratories, test rooms and construction sites. The overall structure is integrated without split complex parts, which occupies little storage space when not in use.
Q9: Is customized size or voltage version available?
A9: Customization service is supported. We can adjust the stand height, length and maximum withstand voltage according to your special test samples (ultra-long insulating rods, special-shaped safety tools). Contact us to provide your test requirements for a customized solution.
Q10: How long is the delivery cycle after order confirmation?
A10: Standard models (50KV / 150KV conventional racks) are in stock, delivery within 3–7 working days. Customized models take 7–15 working days, we will inform you of the exact production schedule before order.
Hot Tags: insulated operating rod test stand, China insulated operating rod test stand manufacturers, factory, SF6 Leakage Detection Device