Of every item in a high-voltage substation, the power transformer is the most expensive to replace and the most vulnerable to lightning and switching surges. That is why the lightning impulse test is one of the most scrutinized type tests on any transformer - and why getting it wrong means either a failed shipment or a field failure months after commissioning.

This guide explains what the lightning impulse test actually does inside a transformer, why both full wave and chopped wave are required, how to read the captured waveforms, and how to size the impulse generator correctly.

 

1. Why Transformers Need Impulse Tests

A transformer winding looks, to a power-frequency test, like a simple coil. Under a fast lightning surge, however, the distributed capacitance between turns, between sections, and between winding and core becomes the dominant circuit. Voltage distributes non-linearly along the winding, and the first few turns can see a disproportionate share of the surge.

That is why a transformer that passes a 5-minute power-frequency withstand test can still fail on its first lightning strike in service. The impulse test reproduces the surge in the factory and exposes weak turn insulation, poorly supported leads, and bad winding geometry before the unit ships.

Per IEC 60076-4 (or GB 1094.4 in China), every new transformer design must undergo lightning impulse type tests.

 

2. The Two Impulse Tests That Every Transformer Faces

2.1 Full-Wave Lightning Impulse (1.2/50 µs)

Applies the full 1.2/50 µs wave right up to the BIL rating.

Tests main insulation: winding-to-earth, winding-to-winding, lead-to-tank.

The wave decays naturally through the transformer's own capacitance.

Typical sequence: 3 shots at 50–75% of rated voltage (reference shots), then 3 shots at 100% BIL.

2.2 Chopped-Wave Impulse (2–6 µs)

A chopping gap fires at 2–6 µs, terminating the wave abruptly.

The sudden collapse injects high-frequency components that travel along the winding and stress inter-turn and inter-section insulation - the insulation between adjacent turns and between winding sections.

This is the test that catches weak coil-winding defects that a full wave would not.

Chopping time standard deviation must stay below ±0.2 µs for a valid report.

A transformer that passes only the full-wave test is not fully type-tested.

 

3. How to Read the Impulse Waveform on a Transformer

When you overlay the three 100%-shots on the recorder, you are looking for repeatability, not just a pretty waveform.

All three traces should overlap almost perfectly on the leading edge and throughout the tail.

A new oscillation, a shifted peak, or a sudden drop in the tail on one of the later shots usually indicates winding failure - a turn-to-turn short that changes the winding's resonant behaviour.

The chopping instants of the three chopped-wave shots should cluster tightly within 2–6 µs.

Peak amplitude should land within ±3% of the rated BIL.

In type-test practice, the operator also watches for:

Flashover across bushings or tap changers - waveform collapses early.

Chopper pre-fire or non-fire - out-of-range chopping time invalidates the shot.

Voltage collapse mid-tail - often a partial inter-turn breakdown that did not quite arc through.

 

4. Sizing the Impulse Generator for Transformer Testing

Transformer capacitance is the hidden driver here. A small distribution transformer (a few hundred kVA) looks like a few hundred picofarads to the impulse generator; a 220 kV power transformer looks like several nanofarads.

Use this rule of thumb:

Transformer class Typical capacitance Minimum generator
10 kV / a few hundred kVA 200–500 pF 200 kV / 10 kJ
35 kV distribution, a few MVA 500–2000 pF 400 kV / 30 kJ
35 kV heavy-duty, 10+ MVA 2000–4000 pF 400 kV / 60 kJ
110–220 kV power transformers 4000 pF and up 800–1200 kV / 60–120 kJ

 

The 400 kV / 30 kV class maintains ≥90% voltage utilization up to 2000 pF load and ≥85% up to 4000 pF - which is exactly the distribution-transformer sweet spot.

For a distribution transformer factory running routine impulse tests, the MOEORW-WGJ43 400 kV / 30 kV with built-in chopping device is the standard configuration.

 

For EHV power transformer manufacturers, the 1200 kV / 120 kJ type-test system is the typical starting point.

 

5. Why a Chopping Device Is Non-Negotiable for Transformer Work

Many budget impulse generators ship without a chopping device, and customers find out too late that their type-test report is incomplete.

A transformer impulse type test per IEC 60076-4 requires:

three full-wave shots at 100% BIL, and

three chopped-wave shots at 100% BIL.

Without a 300 kV-class multi-gap chopping device, you cannot perform the chopped-wave leg of the test - and you cannot issue a complete type-test certificate. The WGJ43 ships with a built-in 300 kV electronic-delay chopping device as standard.

 

6. Common Transformer Impulse Test Failures

Flashover at the bushing-to-tank joint - usually an assembly / workmanship issue, not a design issue.

Inter-turn breakdown on chopped wave - weak coil winding, usually caught by overlaying the reference shot with the failed shot.

Lead-to-tank flashover - insufficient clearance inside the tank, often exposed first on full-wave shots.

Tap changer flashover - tap changer geometry not rated for the fast front.

Chopper misfire - usually ball-gap spacing drifted; motorized gap adjustment on the modern control console eliminates this.

 

7. Conclusion

The lightning impulse test is the harshest and most revealing test a power transformer ever undergoes. Master three things:

Run both full-wave and chopped-wave shots; neither is optional.

Overlay the traces and look for repeatability across the three 100%-shots.

Size the generator by transformer capacitance, not just by its rated voltage - a 30 kJ / 400 kV system covers distribution-class transformers up to ~4000 pF.